  • Liaison with DEWA to obtain the Shutdown Approval and carry out the DEWA Power Cable Jointing works as per DEWA requirement.
  • Shutdown location shall be opened and kept ready for jointing work.
  • Shutdown joint shall be performed by DEWA approved jointers under DEWA supervision.
  • After completion of shut down joint the circuit will be energized by DEWA.